Whoop-Up Drive bridge being assessed after incident

Whoop-Up Drive was closed Wednesday after a piece of heavy equipment being transported on a flatbed trailer struck the underside of the Whoop-Up Drive bridge. 

According to the City of Lethbridge, traffic access to the bridge was immediately closed during an initial safety assessment before partially reopening later in the morning Aug. 6. 

Engineering crews placed support pillars under the bridge while the truck, flatbed trailer and equipment were safely removed Wednesday evening.

These pillars remain in place currently, while crews continue to assess the damage and determine the next steps.  

Director of Infrastructure Services Joel Sanchez says it’s fortunate no one was injured in the incident and engineering crews from Volker Stevin and AECOM were already working on the bridge and were on-site to immediately begin assessing the damage. “This work is ongoing, and we do not yet have specific details on the long-term status of any repairs needed, the potential costs involved or exact timelines.” 

With continued safety for both workers and motorists as the top priority, beginning today there will be further adjustments to traffic flow:  

  • The loop from northbound Scenic Drive onto Whoop-Up Drive will be re-opened  
  • Westbound 6 Avenue into Whoop-Up Drive will be re-opened  
  • There will be zipper-merge locations for westbound traffic, as motorists from 6 Avenue and from the northbound Scenic Drive offramp will merge  
  • That traffic will merge with traffic from the southbound Scenic Drive offramp  
  • To increase capacity and reduce delays, the City is also adjusting eastbound Whoop-Up Drive lanes by moving the inside lane closure closer to the bridge   
  • Both eastbound and westbound Whoop-Up Drive lanes will be fully opened after the bridge decks in each direction 

Right now, Sanchez notes, the City is focusing on the damage caused by the incident. “The lane currently open is going to be checked on a daily basis to make sure there’s no other issues.” 

Having an assessment done quickly on Wednesday allowed the City to reopen the lanes on Whoop-Up Drive. “The lanes that are closed are not a priority right now. We are focused on the lanes that are open to make sure they are safe for motorists and for the people doing the work on the bridge.” 

Lethbridge Police Service is also investigating the incident.

READ MORE: LPS lay charges in Whoop-Up bridge incident

Stan Ashbee
Stan Ashbee
Stan Ashbee is a news reporter, entertainment journalist, singer, songwriter, guitarist, poet and dad. Stan has been with Vista Radio and My Lethbridge Now since January 2024. Prior to working in radio, Stan was a managing editor and journalist for several southern Alberta newspapers and online publications for over 15 years. He was also a mobile DJ/host for over 20 years.
- Advertisement -

cjoc Now playing play

ckbd Now playing play

Related Articles

- Advertisement -

Latest News

River Valley fire ban lifted

Recent moisture and changes in weather has resulted in the River Valley Fire Ban being lifted.

Alberta doctors seek clarity on health-care eligibility ahead of referendum

Alberta physicians want the provincial government to explain how it will assess patients' eligibility for publicly funded health care as the province prepares for its Oct. 19 referendum and rolls out new health-care cards.

Crews knock down southside fire in Lethbridge

Lethbridge fire crews responded to a blaze on the south side of the city over the Thanksgiving weekend.

Environment Lethbridge hosts community repair skills event

Lethbridge residents can learn practical skills, from mending clothing to maintaining bicycles, at an upcoming community event led by local volunteers.

Repeat speeding stops raises concerns on Taber-area roads

Taber police have reported several excessive-speeding incidents in the Municipal District of Taber over the past three weeks.
- Advertisement -